Advanced Industries
Hosting.com – Data Center
This fast-track project consisted of a 4th floor occupied remodel in the historic Gates Rubber Co. building and included a 5,000 square-foot raised floor data center space at 120W/SF, UPS and generator backed at N+1 redundancy, a network operations space and approximately 15,400 square feet of office space to corporate headquarters. Work included 21MW generators installed on the building’s roof, two 750kVA UPS and a remote fuel system.