Advanced Industries
Enveda Biosciences – Lab & Office TI
Howell provided CM/GC services to Enveda’s new 49,000 SF, $20 million laboratory and office build-out. Howell’s scope of work included the full demolition and gut of the existing, second-generation building, and retrofit of the space to accommodate biology and chemistry labs. The two-story building contains primarily laboratory space on the second floor, with smaller labs and offices on the first floor. Because the building has lower ceilings, extensive technical coordination with lab furniture, duct work, and fume hood manufacturers was required to ensure all elements fit within the low ceiling height.