Corporate Interiors
CU Anschutz – B500 5th Floor West Renovation
Howell was selected by CU Anschutz as CM/GC for the renovation of the historical Building 500, 5th Floor West. This 13,000 square-foot project was a total gut and re-build. The project scope included the decommissioning and demolition of an existing data center, asbestos abatement, exterior window replacement, HVAC system replacement, new air handling unit built in place in a mechanical room on the 5th floor, tie-in to campus steam and chilled water, fire sprinkler system upgrade, restroom remodels, and a complete tenant finish for their new administration office space.